Proven in occupied buildings
Real jobs from our own records: survey reports, BM TRADA records of installation, plans of work and analysts' clearance certificates. To protect our clients, we describe each by building type and region.
16 projects
17-storey council tower
A 226-location survey report and a 43-day phase-one programme: asbestos survey, two days' mobilisation and 36 days on the tools, working top down at 1.5 days per floor.
View project →Twin council tower blocks
477 and 398 locations recorded, photographed and rated at 60 minutes, with full-building reports issued. The fire works never waited on a second contractor.
View project →14-storey residential tower
A floor-by-floor report with “installed” against every pin, ready for the landlord's building safety case.
View project →Five-level residential block
An action-required schedule the landlord could price, phase and put in front of the fire authority.
View project →24 low-rise council blocks
Every action logged as approved, pending or query, so the council could watch its action list close block by block.
View project →Housing association offices
Before-and-after completion packs for each office, handed over with the installation records.
View project →Live plant rooms on five sites
A BM TRADA record of installation with before and after photographs for every seal, signed by our approved person.
View project →Library boiler room, library open above
Passed four-stage clearance by the independent analyst first time.
View project →Tenanted housing estate
Eleven licensed removals in eleven working days in the first month, and every home cleared by an independent UKAS-accredited analyst.
View project →Medical centre that stayed open
All four clearance stages passed, no dust found on dismantling, and the plant room went straight back into use.
View project →Grade I listed civic building
Signed off free of dust and debris and handed back for normal use the same day.
View project →Sheltered housing across the North
A four-year working relationship with every order logged to completion, and passive fire works added from 2022.
View project →Tenanted council homes
Reports quality-checked and issued in days, so the trades could plan around the findings.
View project →Vehicle depot under a cement roof
Chrysotile confirmed by a UKAS-accredited laboratory and removal recommended: a clear next step instead of an open question.
View project →Public park outbuilding
The park stayed open throughout, with every repeat visit recorded.
View project →Live pharmaceutical site
Six asbestos-cement items identified and scored, with repair and removal areas marked up on the plans for the follow-on works.
View project →Want the detail behind a project?
We can share references and records with a client or main contractor on request, with the building owner's permission.