24 low-rise council blocks
East Midlands · 2024 to 2026
The work
Fire risk assessment actions closed across general-needs and independent-living blocks: fire stopping, FD30S meter cupboards and overboxes, EI30 fire-rated glazing, 34 wall openings boarded and decorated, door closers and signage, in occupied common areas with cordless tools only.
Outcome
Every action logged as approved, pending or query, so the council could watch its action list close block by block.
Services used
Related projects
17-storey council tower
A 226-location survey report and a 43-day phase-one programme: asbestos survey, two days' mobilisation and 36 days on the tools, working top down at 1.5 days per floor.
View project →Twin council tower blocks
477 and 398 locations recorded, photographed and rated at 60 minutes, with full-building reports issued. The fire works never waited on a second contractor.
View project →14-storey residential tower
A floor-by-floor report with “installed” against every pin, ready for the landlord's building safety case.
View project →