Fire stopping and compartmentation
Compartmentation restored in buildings that stay occupied, installed under BM TRADA Q-Mark third-party certification and recorded seal by seal.

Fire stopping keeps fire and smoke inside the compartment where it starts, which is what makes a stay-put strategy safe. It fails quietly: a cable added through a riser wall, a void left open after a repair, foam where a tested seal should be. We find those gaps, close them with tested systems and leave a record of every one.
We are certified under BM TRADA Q-Mark scheme STD 05b for all four groups of fire-stopping work, and we use tested systems from every major manufacturer, chosen for the substrate, the service and the fire rating. We are not tied to any one brand.
What we do
- Penetration seals around pipes, cables, ducts and mixed services (Group A)
- Linear joint seals at head-of-wall, floor-edge and movement joints (Group B)
- Cavity barriers in ceiling voids, roof spaces and risers (Group C)
- Fire-rated air transfer grilles (Group D)
- Fire-resisting repairs to walls, floors and riser enclosures
- Phased, out-of-hours and ward-by-ward working for buildings that cannot close
From survey to certificate
Survey
We pin and photograph every breach on a floor plan, with the fire rating it needs.
Check for asbestos
Before any void is opened, our surveyors check it. If asbestos is found, our licensed team removes it.
Install
Tested systems installed by our Q-Mark approved installers, labelled at every seal.
Certify
Before and after photographs and a BM TRADA record of installation for every location.
Recent projects
Described by building type and region to protect our clients.
Twin council tower blocks
477 and 398 locations recorded, photographed and rated at 60 minutes, with full-building reports issued. The fire works never waited on a second contractor.
View project →17-storey council tower
A 226-location survey report and a 43-day phase-one programme: asbestos survey, two days' mobilisation and 36 days on the tools, working top down at 1.5 days per floor.
View project →14-storey residential tower
A floor-by-floor report with “installed” against every pin, ready for the landlord's building safety case.
View project →Live plant rooms on five sites
A BM TRADA record of installation with before and after photographs for every seal, signed by our approved person.
View project →Questions we get asked
Are you third-party certified for fire stopping?
Yes. LE Group holds BM TRADA Q-Mark certificate 2713 for fire stopping installation (STD 05b, Groups A to D), valid to 23 February 2029. The same certificate covers fire door installation and maintenance.
Which products do you use?
Tested systems from all the major manufacturers. We choose the system that is tested for the substrate, the service passing through and the fire rating required, and we record the product against every seal.
What happens if you find asbestos in a riser?
Our surveyors check voids before they are opened. If asbestos is found, our own HSE-licensed team removes it and the fire stopping carries on in the same programme. There is no stop and no second contractor.
Can you work while residents stay in the building?
Yes. Most of our fire stopping is in occupied blocks, hospitals and offices. We phase the work floor by floor, keep escape routes clear, use cordless tools where noise matters and keep residents informed.
Other services
Fire doors
FD30S and FD60S doorsets installed, inspected, repaired and maintained under Q-Mark STD 052 and STD 058.
Compartmentation and fire door surveys
A numbered, photographed breach register and a costed remedial schedule, before you commit to a programme.
Licensed asbestos removal
HSE-licensed removal by our own supervisors and operatives, cleared by independent UKAS-accredited analysts.
Asbestos surveys and management
Management, refurbishment and demolition surveys by BOHS P402 surveyors, with registers and re-inspections.
Environmental and remediation
Asbestos in soils and made ground, environmental cleans, contaminated land and the minor civil works around them.
Planning a programme?
Send us the address and what you already know. Our bid and contracts team replies within one working day.