From survey to certificate.Fire stopping, fire doors and licensed asbestos removal for occupied buildings. Self-delivered by our own teams, with no subcontract chain.
Our own people. No subcontract chain.
We don't pass your work down a chain of subcontractors. Our own supervisors, operatives and surveyors deliver it, which is why we can move quickly, keep quality where it should be and stay competitive on price.
Fast to respond
We never wait on a subcontractor's diary. Our own teams are mobilised when your programme needs them, and the people you speak to can commit them.
Quality we control
The people who survey, remove and install are trained, supervised and audited by us, on one certified management system. Standards don't drift down a chain.
Commercially competitive
There is no subcontractor's margin stacked on top of ours. You pay for the work and for proper supervision, not for layers of management.
One point of accountability
One contract, one team, one programme and one evidence pack. If something needs putting right, it is ours to put right, quickly.
The only things we bring in are those that should be independent or are specialist trades: analysts and laboratories (independent by law), licensed scaffolding and electrical work. Why LE Group →
Two disciplines. One accountable team.
Passive fire protection and the asbestos work that sits behind it, each delivered by our own people to the regulation that governs it.

Passive fire protection
Third-party certified fire stopping, fire doors and compartmentation surveys, recorded seal by seal and door by door.

Asbestos and environmental
HSE-licensed removal, HSG264 surveys and environmental work, by our own supervisors and operatives.
Survey once. Make safe. Seal. Certify.
Most fire-stopping contractors stop when a riser turns out to be lined with asbestos. We don't, because we are the licensed asbestos contractor too.
- 01
Survey
Compartmentation, doors and a targeted asbestos survey of every void we will open, in one visit.
- 02
Plan
One programme with any removal priced in from day one and the 14-day HSE notice built in.
- 03
Make safe
Licensed removal by our own team, cleared by an independent UKAS-accredited analyst.
- 04
Seal and install
Tested systems from all manufacturers, installed under BM TRADA Q-Mark.
- 05
Certify
One evidence pack for the golden thread, handed over with the building.
Everything the golden thread needs, handed over together
Fire and asbestos records usually arrive separately, from different contractors. With us you get one pack, for the life of the building.
- Every fire-stopping location pinned on a floor plan, photographed before and after, with product, size and fire rating
- BM TRADA records of installation, signed by our approved person
- Door-by-door records with the repair-or-replace decision for each
- Asbestos survey findings, the register update and independent four-stage clearance certificates
- Waste consignment notes and HSE notifications
- PDF and spreadsheet, held on our system and re-issued on request
Records people can use: LE Comply and Witness
Our partner platforms put fire safety and asbestos records in front of the landlords, building managers and main contractors who need them.
LE Comply
Your buildings' fire safety and asbestos records, in one place.
- Asbestos surveys and registers against each building, available to the people who need them
- Fire door and fire-stopping records from our surveys and works
- Requests for work sent straight to our team
- Each company's data kept in its own separate database
Being prepared for LE Group clients. Ask us about early access.
Witness
Know it is safe to start, and prove it afterwards.
- “Can I work here?” asbestos check before any trade starts in a home or building
- RAMS sent, reviewed and approved per job, with each subcontractor's certificates
- Schemes, works logs and asbestos damage reports, with a clear line of reporting
- Awaab's Law deadlines tracked when a hazard is reported
A partner platform built for main contractors. Ask us for a demonstration.
Written for the people who hold the duty
Accountable and responsible persons, asset managers and the package managers of main contractors.
Social housing
Housing associations, council landlords and ALMOs: tower blocks, low-rise blocks, sheltered schemes and tenanted homes.
Social housing →Public estates
Council corporate property: civic buildings, libraries, depots, parks and offices that stay open.
Public estates →Health and education
Medical centres, hospitals, universities and schools, phased around patients, staff and students.
Health and education →Tier 1 and main contractors
A pre-qualified specialist for your fire safety and asbestos packages, with handover data in your format.
Tier 1 and main contractors →Proven in occupied buildings
Real jobs from our own records. To protect our clients, each is described by building type and region.
Twin council tower blocks
477 and 398 locations recorded, photographed and rated at 60 minutes, with full-building reports issued. The fire works never waited on a second contractor.
View project →Tenanted housing estate
Eleven licensed removals in eleven working days in the first month, and every home cleared by an independent UKAS-accredited analyst.
View project →17-storey council tower
A 226-location survey report and a 43-day phase-one programme: asbestos survey, two days' mobilisation and 36 days on the tools, working top down at 1.5 days per floor.
View project →Public landlords we work for include
- Manchester City Council
- Places for People
- Calico
- Birmingham City Council
- Broxtowe Borough Council
- Nottingham City Homes
Advice from the people who do the work
Awaab's Law Phase 2: what changes on 30 November 2026
Awaab's Law extends to fire, electrical, falls and more from 30 November 2026. The deadlines, what is in and out for fire safety, and where asbestos stands.
Read the guide →Fire doors · 5 min readFire door checks under Regulation 10: what landlords must do
What the Fire Safety (England) Regulations 2022 require of landlords for fire doors, how often, and what a defensible record looks like.
Read the guide →Asbestos and fire · 5 min readSurvey the voids first: asbestos in fire-stopping programmes
Why fire-stopping and compartmentation programmes in older buildings should start with a targeted asbestos survey of the voids they will open.
Read the guide →
Trained by the manufacturers. Directly managed by us.
BOHS P402 surveyors, Q-Mark approved installers and licensed asbestos supervisors and operatives, all directly managed by us. Our fire stopping team trains hands-on with the manufacturers whose systems we install.
Planning a programme?
Send us the address and what you already know. Our bid and contracts team replies within one working day.









