Asbestos disturbed? Call 0113 279 8799 Main contractorsResidentsIreland[email protected]
Passive fire protection

Compartmentation and fire door surveys

Know exactly what is wrong, where it is and what it will take to fix, before you commit to a programme.

Self-delivered. Our own supervisors, operatives and surveyors do this work, with no subcontract chain: faster to mobilise, quality we control, no margin on margin. Why it matters →

A compartmentation survey is a visit of its own. You get the report and the remedial schedule first, and decide on the works afterwards. Our surveyors work floor by floor through risers, ceiling voids, service routes and fire doors, and record every breach so that anyone can find it again.

Because we are also asbestos surveyors, we check the voids we will need to open. Your remedial programme then allows for any asbestos from day one, instead of stopping when it is found.

What we do

  • Non-intrusive and intrusive compartmentation surveys
  • Fire door inspections with a door-by-door schedule
  • Every breach numbered, pinned on a drawing and photographed, with the fire rating required
  • A targeted asbestos survey of the voids the remedial work will open
  • A remedial specification for each breach, using tested systems
  • Report as PDF and spreadsheet, ready to price, phase and share with the fire authority
How we work

From survey to certificate

Plan

We agree access, drawings, resident liaison and the areas to be opened.

Survey

Floor by floor: risers, voids, penetrations, walls and doors, all pinned and photographed.

Check for asbestos

We sample suspect materials in the areas the works will disturb.

Report

A numbered breach register and an action-required schedule you can price and phase.

Questions

Questions we get asked

What does a compartmentation survey give us?

A register of every breach in the compartment lines we surveyed, each with a number, a location on the drawing, photographs, the fire rating required and the recommended remedy. It goes into your fire safety records and turns straight into a programme.

Do you do the survey and the work on the same visit?

No. The survey is its own visit, so you can see the findings and the scope before deciding. If you then instruct us, the same team that surveyed the building carries out and certifies the work.

How long does a survey take?

It depends on the building. On a 17-storey tower we pinned 226 locations across 18 levels and turned them into a 43-day phase-one programme. We will give you a time and price for the survey once we know the building.

Will the survey find asbestos?

We include a targeted asbestos survey of the areas the remedial work will disturb, so the programme allows for any asbestos from the start.

Other services

Planning a programme?

Send us the address and what you already know. Our bid and contracts team replies within one working day.

Talk to our team