Sheltered housing across the North
North of England · 2019 to 2023
The work
Reactive removals in retirement housing: textured coatings, floor tiles, insulating-board boxings and ceilings, each on its own work order and plan of work, with a liaison call before every visit because every resident is treated as vulnerable.
Outcome
A four-year working relationship with every order logged to completion, and passive fire works added from 2022.
Services used
Related projects
17-storey council tower
A 226-location survey report and a 43-day phase-one programme: asbestos survey, two days' mobilisation and 36 days on the tools, working top down at 1.5 days per floor.
View project →Twin council tower blocks
477 and 398 locations recorded, photographed and rated at 60 minutes, with full-building reports issued. The fire works never waited on a second contractor.
View project →14-storey residential tower
A floor-by-floor report with “installed” against every pin, ready for the landlord's building safety case.
View project →